EPOXY KL-5 INDUSTRIAL PAINT WALL RESISTANT BACKGROUND

2.500.000 VND
Xuất Xứ:

PRODUCT DESCRIPTION

EPOXY KL-5 antibacterial industrial wall paint is a 2-component water-based epoxy paint, based on an epoxy film-forming agent used to cover the walls of industrial workshops, basements, water tanks, wastewater treatment tanks, and parking lots. , water park, food factory, pharmacy, hospital, school. Usable for S background.

SUPERIOR CHARACTERISTICS

  • Mild chemical resistant, waterproof, resistant to slight back pressure.
  • Wear-resistant, easy to clean.
  • Built-in outstanding antibacterial and antifungal properties. The gloss of the paint film can be adjusted.
  • Good adhesion on the surface of cement mortar, concrete, steel, wood
  • Non-flammable, non-toxic, free of lead, mercury and other harmful chemicals, safe for construction and use

    PRODUCT INFORMATION

    Applicable surfaces: Concrete, cement mortar, metal, wood surfaces
    Theoretical norm: 4.0 – 5.0m2/kg (for 2 layers), depending on the surface of the material.

    CONSTRUCTION INSTRUCTIONS

    SURFACE PREPARATION

    • All surfaces must be dry and free of dirt, grease, moss, lime, old paint.
    • For new walls, it takes at least 12 days for the structure to stabilize before painting.
    • It is recommended to use waterproofing agent KOVA CT-11A, mastic KOVA KL-5 before applying industrial paint EPOXY KL-5 antibacterial wall
    CONSTRUCTION
    • Step 1: Stir the paint ingredients thoroughly. Add all the additives to the paint, absolutely do not leave any additives, stir again, can add 5-10% clean water to fit the liquid (The weight of 2 components has been weighed in the barrel according to the prescribed ratio. , the paint film will not dry without enough additives).
    • Step 2: Allow about 3 minutes for the additive to react with the paint. Stir once more before painting.
    • Step 3: Apply 2 coats of KL-5, each layer is spaced at least 8 hours apart. The paint film reaches the maximum hardness after 7 days (Must use all paint within 30-45 minutes after mixing the 2 components, after that time the paint will harden and the quality will decrease. arrive there).
    NOTE
    • Only apply when the weather is dry and the surface temperature does not exceed 400C. Do not apply in high humidity weather.
    • When construction and after construction is completed, ensure ventilation so that the paint film dries quickly and ensures gloss. If the surface is not good, it will make the paint take a long time to dry and the paint will be white and translucent, losing its luster.
    • Do not apply paint on cement paste, ceramic tiles, stone and other very smooth surfaces because the paint is difficult to adhere to
    SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION

    Đại lý có tài khoản vui lòng đăng nhập để mua hàng hoặc đăng ký tài khoản (tại đây).

    Nếu bạn chưa là đại lý trong hệ thống Cường Lâm vui lòng liên hệ chúng tôi (tại đây).

    ×

    Net Orders Checkout

    Item Price Qty Total
    Subtotal 0 VND
    Shipping
    Total

    Shipping Address

    Shipping Methods